The question asks to identify the option that is NOT directly associated with the core new product development (NPD) process. Let's analyze each option:
Comparing the options, QFD, FEMA, and DFMA are established methodologies specifically employed during the various stages of new product development to define requirements, ensure quality, and optimize design. Kanban, while important for efficient operations and production, is fundamentally a workflow and production scheduling tool, not a primary NPD process methodology.
Therefore, KANBAN is the option NOT directly associated with the process of new product development.
Which of the following industries will consume maximum power per tonne of product?
Match the processes of product development with their characteristics.
Process | Characteristic | ||
| P | Product synthesis | 1 | Process of conversion of conceptual design into engineering science based model |
| Q | Product simplification | 2 | Process related to design conceptualization |
| R | Product analysis | 3 | Process of maintaining uniformity and consistency |
| S | Product standardization | 4 | Process of reducing the number of parts without losing the functionalities |