Which one of the following chart gives simultaneously information about the progress of work and machine loading?

The correct answer is

Man-machine chart

Understanding Charts for Work Analysis

Different charts and diagrams are used in work study and operations management to analyze and improve processes. The question asks for a chart that provides information on both the progress of work and the loading of machines simultaneously.

Analyzing the Chart Options

Let's look at the different options provided and what information each type of chart typically presents:

  • Bar chart: A bar chart usually compares different categories or tracks changes over time. While it can show aspects of work progress (like tasks completed over time), it doesn't typically detail machine loading specifically.
  • Machine load chart: This chart focuses on the load or demand placed on machines over a period. Its primary purpose is to show machine utilization and identify bottlenecks or idle time related specifically to machines. It doesn't inherently detail the operator's activities or overall work progress beyond the machine's involvement.
  • Man-machine chart: This chart is specifically designed to show the synchronized activities of a worker (man) and a machine over a period of time. It graphically represents what the worker is doing and what the machine is doing (running, idle, being loaded/unloaded) at the same time. This allows for the analysis of idle time for both the man and the machine and helps optimize their combined activities. By showing both man's work cycle and machine's operational cycle, it effectively reflects work progress from the operator's perspective and machine loading/utilization from the machine's perspective.
  • Pie chart: A pie chart represents parts of a whole and is typically used to show proportions or percentages at a single point in time. It is not suitable for illustrating progress over time or the dynamic loading of machines.

Man-Machine Chart: Combining Work Progress and Machine Loading

The Man-machine chart is uniquely suited to provide information on both work progress and machine loading simultaneously. It breaks down the work cycle into elements and shows when the man is working, when the machine is working, and when either is idle. This detailed view allows for:

  • Identifying idle time for both man and machine.
  • Optimizing the sequence of operations.
  • Determining the number of machines a single operator can manage efficiently.
  • Visualizing the relationship between manual work and machine operation, thus showing progress (tasks completed) in conjunction with machine utilization (loading).

Therefore, the chart that gives simultaneous information about the progress of work (through the man's activity) and machine loading (through the machine's activity and idle time) is the Man-machine chart.

Was this answer helpful?

Important Questions from Project Management

  1. Factors which govern the operating cost of an equipment are :

    1. Purchase price of the equipment

    2. Depreciation due to regular use

    3. Cost of operation, maintenance and repairs

    Which of the above statements are correct ? 

  2. In Emerson's efficiency plan of wage incentive system, the bonus is paid to-

  3. Match List I with List II

    LIST I

    (Project Network concepts)

    LIST II

    (Underlying meaning)

    A.Crashing an activityI.Length of the longest path through the project network
    B.Project NetworkII.It shows the time and cost when the activity is fully crashed
    C.Critical pathIII.It consists of a number of nodes and a number of arcs that connects two different nodes
    D.Crash pointIV.Taking special (costly) measures to reduce the duration of an activity below its normal value

    Choose the correct answer from the options given below:

  4. The following statements relate to project network. Choose the correct code for the statements being correct or incorrect.

    Statement I: An activity cannot be represented by more than one arrow, but an arrow can represent one or more activities.

    Statement II : The activities in a critical path can be preponed or postponed.

  5. A public limited company has 9,00,000 shares outstanding at current market price of Rs. 130 per share. The company needs Rs. 2.25 crores to finance its proposed new project. The board of the company has decided to issue rights shares to raise the required money at Rs. 75 per share (as subscription price) to ensure that the rights issue is fully subscribed. How many rights are required to purchase a new share ?

Need Expert Advice?

Start Your Preparation with Prepp Mobile App

Download the app from Google Play & App Store
Download the app from Google Play & App Store
Prepp Mobile App