Which of the following states has maximum wind power potential in India as per MVRE's latest report?
Gujarat
Wind power is a renewable energy source that harnesses the kinetic energy of wind to generate electricity. India has significant wind power potential due to its long coastline and favorable wind patterns in various regions. Assessing this potential accurately is crucial for planning renewable energy development.
The Ministry of New and Renewable Energy (MNRE), also often referred to by similar acronyms like MVRE in some contexts, periodically assesses the renewable energy potential across different states in India. These assessments help in identifying key areas for the installation of wind power projects.
According to recent reports from MNRE regarding wind power potential at 100-meter and 120-meter hub heights, different states have varying capacities. The potential is estimated based on detailed wind resource mapping and analysis.
Based on the latest assessments by MNRE, the state with the maximum wind power potential in India is Gujarat. Gujarat benefits from a long coastline and strong wind speeds, making it an ideal location for wind power generation.
Let's look at the estimated wind power potential for some states at 120-meter hub height (as per NIWE data often used by MNRE):
| State | Estimated Wind Power Potential (GW) at 120m |
|---|---|
| Gujarat | 84.43 |
| Rajasthan | 18.77 |
| Tamil Nadu | 33.79 |
| Karnataka | 12.48 |
| Maharashtra | 45.39 |
From the table, it is clear that Gujarat has the highest estimated wind power potential among the listed states and overall in India, according to the assessments considered by MNRE.
Therefore, as per MVRE's latest report (referring to MNRE's assessments), Gujarat has the maximum wind power potential in India.
| Term | Definition | Significance |
|---|---|---|
| Wind Power Potential | The estimated total amount of electricity that could be generated from wind energy in a specific area. | Helps identify areas for setting up wind farms. |
| Hub Height | The height of the center of the wind turbine rotor above the ground. Wind speeds are generally higher at greater heights. | Potential increases significantly with higher hub heights (e.g., 100m, 120m). |
| MNRE (Ministry of New and Renewable Energy) | Government ministry in India responsible for renewable energy. | Assesses potential, sets policies, and promotes renewable energy growth. |
Which of the following rocks is formed by the cooling and crystallisation of magma?
Which of the following is the largest sink of CO 2gas?
Which one of the following is not a fossil fuel?
A. Coal
B. Oil
C. Peat
D. Electricity
From the energy security perspective, which of the following energy sources is considered most secure for India?
Identify the correct sequence of countries that are the world's leading geothermal power (in MW) producers.
A. New Zealand
B. Iceland
C. USA
D. Indonesia
Choose the correct answer from the options given below