All Exams Test series for 1 year @ ₹349 only
Question

Which of the following statements is/are correct with respect to temporary structures during construction?

Temporary Construction Structures Analysis

Statement 1: Centering Functionality

Centering refers to the temporary framework used to support formwork during the construction of elements like arches, domes, and slabs. Its primary role is to hold the structure in place until it cures and gains sufficient strength to support itself. Therefore, this statement accurately describes the function of centering.

Statement 2: Scaffolding Purpose

Scaffolding provides essential elevated working platforms and access for construction workers. It is crucial for tasks like masonry, plastering, and facade work, allowing workers to operate safely at different heights. This statement correctly defines the purpose of scaffolding.

Statement 3: Shoring's Role

Shoring involves providing temporary support to unstable soil, trenches, or adjacent structures to prevent collapse during excavation or construction. Its function is structural support, not preventing dampness. Dampness prevention is achieved through waterproofing methods. Thus, this statement is incorrect.

Statement 4: Underpinning Application

Underpinning is a technique used to strengthen, repair, or deepen existing foundations. It ensures the stability and load-bearing capacity of a structure, often when original foundations are inadequate or soil conditions change. This statement correctly describes underpinning.

Conclusion on Correct Statements

Based on the analysis:
  • Statement 1 (Centering) is correct.
  • Statement 2 (Scaffolding) is correct.
  • Statement 3 (Shoring) is incorrect.
  • Statement 4 (Underpinning) is correct.
The correct options correspond to statements 1, 2, and 4, identified as A, B, and D respectively.
Was this answer helpful?

Important Questions from Building Methods and Details

  1. If Beam : Column :: Transom : X,
    which of the following options can replace 'X'?
  2. Match the elements in Group-I with the building components in Group-II 

    Group-I Group-II 
    P. King post1. Curtain glazing
    Q. Grade beam2. Door
    R. Metal decking3. Plinth
    S. Jamb4. Intermediate floor
     5. Truss

     

  3. Match the following types of masonry joints in Column - I with their corresponding description in Column - II, and select the appropriate option.
     

    Column - IColumn - II
    P
    1Struck
    Q
    2Weathered
    R
    3Raked
    S
    4Beaded
      5Concave
  4. Toothing is a construction technique used in
  5. Hip roof is formed by surfaces sloping in
Need Expert Advice?

Start Your Preparation with Prepp Mobile App

Download the app from Google Play & App Store
Download the app from Google Play & App Store
Prepp Mobile App