Which among the following is the second stage of pre - construction treatment with durmet?

The correct answer is

Treatment of refill in contact with foundation

Pre-construction Termite Treatment Stages with Durmet

Pre-construction termite treatment is a crucial step in preventing termite infestation in a new building. It involves treating the soil and structural elements with termiticides like Durmet at various stages of construction. The treatment creates a chemical barrier that repels or kills termites attempting to enter the building.

Understanding the stages of pre-construction treatment is important. While the exact sequence or names might vary slightly based on local regulations or specific product guidelines, a common sequence of pre-construction termite treatment stages is followed:

  • First Stage: Treatment of the bottom and sides of trenches dug for foundations and basements.
  • Second Stage: Treatment of the backfill or refill soil applied against the foundation walls.
  • Third Stage: Treatment of the soil surface below the ground floor slab.
  • Subsequent Stages: Treatment of soil around pipes and conduits entering the soil, treatment of the junction of floor and wall, and treatment of the external perimeter soil after the building is complete.

Let's examine the options in the context of these stages:

  • Option 1: Treatment of junction of floor and wall - This is typically done after the floor is laid, often considered a later stage or even post-construction in some protocols.
  • Option 2: Treatment of refill in contact with foundation - This refers to the soil that is backfilled or refilled around the foundation walls after they are constructed. This aligns with the second stage of pre-construction treatment.
  • Option 3: Treatment of soil below floors - This refers to treating the soil surface before the floor slab is laid, which is typically the third major stage.
  • Option 4: Treatment of wall trenches and basement excavation - This is the treatment of the soil at the very beginning, covering the areas where the foundation will be built. This is generally the first stage of pre-construction treatment.

Based on the standard sequence of pre-construction termite treatment using products like Durmet, the second stage involves treating the soil that is used to backfill against the foundation.

Was this answer helpful?

Important Questions from Miscellaneous Material

  1. In roofing sheet terminology, CGI means -

  2. Which of the following types of stones shows the least water absorption property?

  3. Hydraulic lime is obtained by

  4. Which of the following metamorphic rocks has the most weather resisting characteristics?

  5. Which one of the following is obtained by burning kankar or clayey lime stones ?