What are the different criteria for the evaluation of family planning ?
(a) Goal effectiveness
(b) Realized efficiency
(c) Potency effectiveness
(d) Capacity effectiveness
Codes :

The correct answer is
(a), (b), (c), (d)

Family Planning Evaluation Criteria Explained

Evaluating family planning programs involves assessing their effectiveness and efficiency using specific criteria. These criteria help determine how well a program meets its objectives and utilizes resources.

Key Evaluation Criteria

  • Goal Effectiveness: This measures how well the program achieves its stated objectives, such as increasing contraceptive prevalence or reducing unintended pregnancies. It focuses on the outcomes achieved compared to the planned goals.
  • Realized Efficiency: This criterion assesses the program's performance in relation to the resources consumed. It examines whether the program is delivering its services and achieving results in a cost-effective manner.
  • Potency Effectiveness: This relates to the inherent capability or potential of the methods or interventions used within the family planning program. It looks at the theoretical effectiveness of the chosen contraceptive methods or strategies.
  • Capacity Effectiveness: This assesses the program's ability or potential to achieve its goals based on its available resources, infrastructure, and operational capacity. It's about the program's potential performance.

All four criteria – Goal effectiveness, Realized efficiency, Potency effectiveness, and Capacity effectiveness – are considered important for a comprehensive evaluation of family planning initiatives.

Was this answer helpful?

Important Questions from Project Management

  1. Factors which govern the operating cost of an equipment are :

    1. Purchase price of the equipment

    2. Depreciation due to regular use

    3. Cost of operation, maintenance and repairs

    Which of the above statements are correct ? 

  2. In Emerson's efficiency plan of wage incentive system, the bonus is paid to-

  3. Match List I with List II

    LIST I

    (Project Network concepts)

    LIST II

    (Underlying meaning)

    A.Crashing an activityI.Length of the longest path through the project network
    B.Project NetworkII.It shows the time and cost when the activity is fully crashed
    C.Critical pathIII.It consists of a number of nodes and a number of arcs that connects two different nodes
    D.Crash pointIV.Taking special (costly) measures to reduce the duration of an activity below its normal value

    Choose the correct answer from the options given below:

  4. The following statements relate to project network. Choose the correct code for the statements being correct or incorrect.

    Statement I: An activity cannot be represented by more than one arrow, but an arrow can represent one or more activities.

    Statement II : The activities in a critical path can be preponed or postponed.

  5. A public limited company has 9,00,000 shares outstanding at current market price of Rs. 130 per share. The company needs Rs. 2.25 crores to finance its proposed new project. The board of the company has decided to issue rights shares to raise the required money at Rs. 75 per share (as subscription price) to ensure that the rights issue is fully subscribed. How many rights are required to purchase a new share ?