The work done on an object does not depend upon:
Path followed
Work done on an object is a measure of energy transfer that occurs when a force acts on the object over a displacement. In simple terms, work is done when a force causes an object to move. The amount of work done depends on several factors related to the force and the displacement.
The work done ($W$) by a constant force ($F$) on an object that undergoes a displacement ($d$) is given by the formula:
$$W = F \cdot d \cdot \cos(\theta)$$
Here, $\theta$ is the angle between the direction of the force vector and the direction of the displacement vector.
Let's analyze how work done depends on the factors listed in the options:
Based on the analysis of the work done formula, the work done on an object depends on the force applied, the displacement, and the angle between them. It does not depend on the specific path taken by the object between its initial and final positions (especially in the context of displacement used in the work formula).
The work done on an object does not depend upon the path followed.
A body of mass 100 kg rests on a horizontal plane, the value of coefficient of friction between the body and plane being 0.025. Find the work done in moving the body through a distance of 10 metres along the plane.
A load of 16.5 kg is lifted through a height of 3.4 metres. Find the work done in kg metre.
The energy equivalence of 1 eV is
A body of mass 100 kg rests on a horizontal plane, the value of coefficient of friction between the body and plane being 0.025. Find the work done in moving the body through a distance of 10 metres along the plane.
The work done by a person in carrying a box of mass 15 kg through a vertical height of 5 m is 5000 J. The mass of the person is _______ Take g = 10 m/s 2