Question

The process of marking the positions of various foundations and other elements on to the ground as per the drawings is called as

The correct answer is

Setting out of foundations

The process described in the question is known as "Setting out of foundations" or more generally, "Setting out" or "Layout." It involves transferring the details from the building plans, such as the location, dimensions, and alignment of foundation walls, columns, and footings, onto the construction site itself.

Was this answer helpful?

Important Questions from Substructure

  1. Temporary arrangement of boardings, wailings and struts which is provided to give support to sides of trench is known as___________.

  2. The portions of the structure below the ground level are called as

  3. A layer provided to prevent entry of unwanted moisture inside the building either by seepage or by leakage is known as

  4. The structure which is used to divide the stages in different levels is termed as-

  5. The layout for substructure work must consider nearby underground based utilities because:

Need Expert Advice?

Start Your Preparation with Prepp Mobile App

Download the app from Google Play & App Store
Download the app from Google Play & App Store
Prepp Mobile App