The process of determining the plotted position of the station occupied by the plane table, by means of sights taken towards known points is termed as ________.
The process described in the question is a fundamental technique in plane table surveying used to determine the exact location of the plane table station (where the surveyor is standing) on the map.
What is Resection?
Resection involves orienting the plane table and plotting the instrument's station position using bearings taken from the station to two or more known points (points whose locations are already plotted on the map or are known reference points). The surveyor sets up the plane table at an unknown location, sights known points, and uses these observations to pinpoint their own location on the plan.
How Resection Works:
Comparing Resection with Other Methods:
It's helpful to understand why other options are not the correct term:
Therefore, the specific process of determining the station's plotted position by taking sights towards known points is called resection.
What is the function of the plumbing fork in plane table surveying?
When only one point is available for orientation, orientation is done by:
After fixing the plane table to the tripod, the main operations which are needed at each plane table station are:
i) leveling
ii) orientation
iii) centering
The correct sequence of these operations is-The size of plane table is
In the plane table survey, 'three point problem' and 'two point problem' are orientation methods connected to: