Setting out of the foundation is a process executed

The correct answer is
before the foundation excavation

Foundation Setting Out: Timing Is Key

The setting out process involves accurately marking the location and dimensions of a planned foundation onto the ground surface.

This crucial step defines exactly where excavation work needs to take place.

Setting Out Sequence in Construction

Considering the purpose of setting out:

  • It establishes the footprint of the foundation.
  • Subsequent activities, like excavation, rely on these markings.

Therefore, the setting out of a foundation must happen before the foundation excavation commences.

Options suggesting it happens after excavation or concreting are incorrect because the excavation itself is guided by the setting out marks. Placing plinth beam reinforcement occurs much later in the construction sequence.

Correct Timing Explained

The correct stage for foundation setting out is definitively before the foundation excavation.

Was this answer helpful?

Important Questions from Building Methods and Details

  1. If Beam : Column :: Transom : X,
    which of the following options can replace 'X'?
  2. Match the elements in Group-I with the building components in Group-II 

    Group-I Group-II 
    P. King post1. Curtain glazing
    Q. Grade beam2. Door
    R. Metal decking3. Plinth
    S. Jamb4. Intermediate floor
     5. Truss

     

  3. Match the following types of masonry joints in Column - I with their corresponding description in Column - II, and select the appropriate option.
     

    Column - IColumn - II
    P
    1Struck
    Q
    2Weathered
    R
    3Raked
    S
    4Beaded
      5Concave
  4. Toothing is a construction technique used in
  5. Hip roof is formed by surfaces sloping in
Need Expert Advice?

Start Your Preparation with Prepp Mobile App

Download the app from Google Play & App Store
Download the app from Google Play & App Store
Prepp Mobile App