Question

Match List I with List II. 
 

List – I (Thermal Power Plants in India)List – II (States)
A. NTPC Ramagundam Super Thermal Power PlantI. Maharashtra 
B. Mundra Thermal Power StationII. West Bengal
C. Mejia Thermal Power StationIII. Telangana
D. Trombay Thermal Power PlantIV. Gujarat

The correct answer is
A-III, B-IV, C-II, D-I

Matching Indian Thermal Power Plants with States

This question requires matching thermal power plants in List I with their corresponding states in List II.

A. NTPC Ramagundam Super Thermal Power Plant

The NTPC Ramagundam Super Thermal Power Plant is located in Telangana. This corresponds to Roman numeral III.

Match: A - III

B. Mundra Thermal Power Station

The Mundra Thermal Power Station is situated in Gujarat. This corresponds to Roman numeral IV.

Match: B - IV

C. Mejia Thermal Power Station

The Mejia Thermal Power Station is located in West Bengal. This corresponds to Roman numeral II.

Match: C - II

D. Trombay Thermal Power Plant

The Trombay Thermal Power Plant is situated in Maharashtra. This corresponds to Roman numeral I.

Match: D - I

Final Matching Summary

Combining the individual matches, the correct pairing is:

  • A - III (Telangana)
  • B - IV (Gujarat)
  • C - II (West Bengal)
  • D - I (Maharashtra)

This corresponds to the option A-III, B-IV, C-II, D-I.

Was this answer helpful?

Important Questions from Industry And Infrastructure

  1. The classification of Micro, Small and Medium enterprises is based on which of the following factors?
    1. Annual turnover
    2. Number of workers
    3. Investment in plant and machinery or equipment
    Select the answer using the codes given below :
  2. Match List I with List II and select the correct option from the given codes.
     

    List – IList – II
    A. Five Indian Institutes of Technology (IITs) were started as major technical institutionsIV. First Five-Year Plan
    B. KVIC (Khadi Village Industries Commission) was set upIII. Second Five-Year Plan
    C. Gadgil YojnaII. Third Five-Year Plan
    D. The Minimum Needs Program (MNP) was launchedI. Fifth Five Year Plan
  3. How many Industrial Area Development Authorities are Working in Jharkhand?
  4. In which Five-Year plan was Bokaro steel plant established?
  5. Where is Hindalco Aluminium Industry?
Need Expert Advice?

Start Your Preparation with Prepp Mobile App

Download the app from Google Play & App Store
Download the app from Google Play & App Store
Prepp Mobile App