In surveying, a point is established using:
In surveying, establishing a new point means determining its precise location relative to other known points. This is a fundamental task in setting out construction works, mapping, or creating control networks. The accuracy of the established point depends heavily on the reliability of the reference points used.
Reference points are locations whose coordinates (horizontal and/or vertical) are already known and assumed to be fixed or stable. These points form the basis of a surveying network. To establish a new point, surveyors measure angles, distances, or both, from one or more of these known reference points to the new point.
Consider the process of locating a point on a 2D plane. If you only have one reference point, you can determine the distance from it to the new point. This defines a circle around the reference point where the new point could lie, but doesn't give a unique location.
If you have two reference points, you can use methods like:
Both these basic methods require measurements from at least two distinct reference points to uniquely determine the position of a new point in a 2D plane. For 3D positioning, similar principles apply, often involving height references as well.
Let's look at the given options in the context of surveying principles:
Based on the fundamental principles of surveying, establishing the position of a new point requires referencing it from locations whose coordinates are already known and stable. A minimum of two such fixed reference points is necessary to uniquely determine the location of the new point using common surveying techniques like intersection or trilateration.
| Option | Analysis | Correctness |
|---|---|---|
| at the most three points of reference | Incorrect upper limit; more can be used. | Incorrect |
| at the most two, already fixed points of reference | Incorrect upper limit; more can be used. | Incorrect |
| at least two points of reference | Requires "already fixed" points; missing crucial detail. | Incorrect |
| at least two, already fixed points of reference | Correct minimum requirement and condition (fixed). | Correct |
Therefore, a point in surveying is established using at least two, already fixed points of reference.
| Concept | Description | Importance in Surveying |
|---|---|---|
| Reference Point (Control Point) | A point whose coordinates are accurately known. | Provides the known framework for locating other points. |
| Establishing a Point | Determining the coordinates of a new, unknown point. | Essential for mapping, setting out construction, etc. |
| Intersection | Locating a point by measuring angles from known points. | Requires at least two known points. |
| Trilateration | Locating a point by measuring distances from known points. | Requires at least two known points. |
Surveying often involves creating a network of fixed points, called control points. These points are established with high accuracy using techniques like GPS, triangulation, trilateration, or traversing, often tied to national or global coordinate systems. When establishing a new point for a specific project, surveyors connect it to at least two of these existing, already fixed control points within the network. Using more than two points provides redundancy, which helps detect errors and improve the overall accuracy and reliability of the determined position of the new point.
Which of the following statement is not correct for the principle of surveying?
The maximum error (mm) on the drawing should not be greater than _____.
Plumb bob lines at two different places in geodetic surveying will _____.
Calculate the length of one division of the vernier scale, if least count of the combination of main and vernier scale is 0.02 mm. The least count of the main scale is 1 mm.
Plumb bob lines at two different places in plane surveying are _____.