In an aqueduct, natural drainage is kept at the following of a canal
below
When an irrigation canal needs to cross a natural drainage channel, such as a stream or river, engineers design special structures. These are known as cross drainage works. The type of structure built depends on the relative levels of the canal bed and the drainage bed, as well as the nature of flow in both. One common type of cross drainage work is an aqueduct.
An aqueduct is a hydraulic structure that allows an irrigation canal to pass over a natural drainage channel. Think of it like a bridge for the canal water, allowing it to flow above the river or stream below. This design is used when the bed level of the canal is higher than the bed level of the natural drainage.
In an aqueduct, the defining characteristic is the relative positioning of the two channels. The canal flows in a trough built supported by piers, effectively elevating the canal water level. The natural drainage channel passes underneath this trough.
Therefore, in a standard aqueduct:
The natural drainage maintains its natural course and flow pattern, simply passing beneath the elevated canal structure. The canal water flows by gravity in the elevated trough.
To reiterate the key relationship in an aqueduct structure:
| Channel Type | Relative Vertical Position |
|---|---|
| Canal Water Level | Higher (Above) |
| Natural Drainage Channel | Lower (Below) |
This arrangement ensures that the canal water can be transported across the drainage path without interruption, and the drainage flow is also unimpeded as it flows underneath the canal.
| Structure Part | Position Relative to the Other Channel |
|---|---|
| Canal | Above the natural drainage |
| Natural Drainage | Below the canal |
Besides aqueducts, other structures are used for cross drainage depending on the site conditions:
Understanding these different types of cross drainage works helps clarify why, in an aqueduct specifically, the natural drainage is positioned below the canal.
A cross drainage work in which a canal is provided over the natural drainage is called:
Which of the following is not a cross-drainage work?
The cross drainage structure in which the canal bed level is kept much higher than the high flood level (HFL) of a stream is called
When the drain is over the canal, and FSL of canal is below the bed level of drain the structure provided is known as
Select the correct option for the given statements.
Statement 1: When the crossing site is such that the canal FSL is well above the stream HFL, the choice between aqueduct and siphon aqueduct is made depending on the stream discharge.
Statement 2: For larger stream discharges (i.e. when the stream bed is much wider), an aqueduct is more suitable than a siphon aqueduct which requires lowering of the stream bed by a drop.