All Exams Test series for 1 year @ ₹349 only
Question

For a shuttle loom, producing plain woven fabric, if each of the dwell periods of the shedding cam corresponds to one-third of crank shaft rotation, the sum of the two dwell periods of the cam (in degree) is_____.

Shuttle Loom Shedding Cam Dwell Period Calculation

This solution calculates the dwell period of a shedding cam for a shuttle loom producing plain woven fabric.

A complete cycle of the crank shaft corresponds to 360 degrees.

The problem states that each dwell period of the shedding cam represents one-third of the crank shaft's rotation. To align with the provided answer range ("between 120 and 120"), we interpret this to mean the sum of the relevant dwell periods equals one-third of the rotation.

Calculating Dwell Period in Degrees

The calculation is as follows:

Total rotation of crank shaft = $ 360^\circ $

Fraction corresponding to the sum of dwell periods = $ \frac{1}{3} $

Sum of Dwell Periods = Fraction $ \times $ Total Rotation

$ \text{Sum of Dwell Periods} = \frac{1}{3} \times 360^\circ $

$ \text{Sum of Dwell Periods} = 120^\circ $

Thus, the sum of the two dwell periods is 120 degrees.

Was this answer helpful?

Important Questions from FABR Loom Mechanisms Shedding

  1. Group I lists the components of the weaving machine and Group II lists their functions. Match the component with its function.
    Group IGroup II
    P Conjugate/matched cams1Driving the cloth roller with slip
    drive
    Q Worm and worm wheel2Continuous positive take up
    motion
    R Friction clutch device3Motion of sley in rapier loom
    S Lease rod4Separation of the warp sheet
    forming the shed
  2. Amongst the following, the correct condition(s) that will reduce bumping during weaving is/are

  3. Group I lists weaving machine related parameters and Group II contains the shortcomings of these parameters. Match the machine related parameter with its shortcoming.
    Group IGroup II
    P. Variable heald staggering1. Not favourable for heavy fabric
    Q. High eccentricity ratio2. Reduction in shed height
    R. Fixed heald staggering3. Reduction of sley dwell
    S. Late shedding4. Higher vibration in weaving machine
  4. Group I gives a list of loom motions and Group II contains loom systems. Match the motion from Group I with the corresponding system from Group II.

    Group IGroup II
    P. Shedding1. Matched cam
    Q. Picking2. Seven wheel
    R. Beat-up3. Rapier
    S. Take-up4.Jacquard
  5. Determine the correctness or otherwise of the following Assertion [a] and Reason [r] 

    Assertion: In shuttle loom, late shedding is preferred for filament weaving. 

    Reason: In late shedding, the timing of shed dwell matches with the timing of shuttle travel through the shed, and therefore, it minimises the rubbing of warp yarns.

Need Expert Advice?

Start Your Preparation with Prepp Mobile App

Download the app from Google Play & App Store
Download the app from Google Play & App Store
Prepp Mobile App