For a highway project, preliminary survey is done for _______.

The correct answer is topographic details and soil survey

Highway Preliminary Survey Explained

The preliminary survey is a critical early stage in the planning and design of a highway project. It is carried out before the detailed design begins and its main purpose is to gather essential information about the project area.

Purpose of Preliminary Survey for Highways

The primary objective of the preliminary survey is to obtain data that helps in:

  • Selecting the most feasible and economical route alignment.
  • Evaluating the engineering challenges and potential environmental impacts.
  • Collecting necessary data for preparing preliminary designs and cost estimates.

Key Components of a Highway Preliminary Survey

A preliminary survey typically involves several activities to collect comprehensive data:

Activity Description
Reconnaissance Survey Initial inspection of the area to identify potential routes and major controlling points or obstacles.
Topographic Survey Detailed mapping of the terrain, showing elevation contours, existing structures, water bodies, land use, and other natural and man-made features within a wide corridor along potential routes.
Soil Survey (Geotechnical Investigation) Investigation of soil types, properties, and stratification along the potential alignments to understand bearing capacity, stability issues, and material suitability.
Traffic Studies Collecting data on existing traffic volume and patterns to project future traffic needs.
Environmental and Socio-economic Studies Assessing potential impacts on the environment and local communities.

Focus on Topographic Details and Soil Survey

Out of the activities listed, the collection of topographic details and conducting a soil survey are fundamental and indispensable parts of the preliminary survey phase for a highway project. This data directly informs the technical feasibility and initial design decisions, such as:

  • Determining horizontal and vertical alignment based on terrain.
  • Estimating the volume of earthwork (cuts and fills) required.
  • Identifying areas with poor soil conditions that might require special treatment.
  • Locating sources of construction materials like aggregates and suitable fill material.

Why Other Options are Not Preliminary Survey Activities

Let's look at the other options:

  • Preparation of subgrade: This is a construction activity, occurring after the design is finalized and the route is cleared.
  • Design details of embankment: Detailed design of embankments happens during the design phase, *after* the preliminary survey data on topography and soil is analyzed.
  • Quality control tests: These tests are performed during and after construction to ensure that materials and workmanship meet specified standards.

Therefore, the primary activities during the preliminary survey phase are indeed gathering topographic details and conducting a soil survey to inform the subsequent stages of planning and design.

Was this answer helpful?

Important Questions from Highway Development and Planning

  1. The type of road pattern adopted by city roads of Chandigarh is:

  2. The width of carriageway for two-lane road with raised Kerb is _________.

  3. Street inlets for draining rainwater are located along the roadside on straight roads at an interval of ______.

  4. The allowed shift of alignment as per Indian Code on Bridges is ______.
  5. The second twenty year road plan is also called _______.
Need Expert Advice?

Start Your Preparation with Prepp Mobile App

Download the app from Google Play & App Store
Download the app from Google Play & App Store
Prepp Mobile App