All Exams Test series for 1 year @ ₹349 only
Question

Following are the common procedural steps in ecological impact analysis process. Arrange them from the first to the last step.
A. Focussing
B. Impact Assessment
C. Impact Evaluation
D. Impact Mitigation
E. Scoping
Choose the correct answer from the options given below:

The correct answer is
E, A, B, D, C

Ecological Impact Analysis Process Steps

The ecological impact analysis follows a structured sequence to evaluate potential environmental effects. Arranging these steps correctly is essential for a thorough assessment.

1. Scoping (E)

This initial stage defines the boundaries and main issues of the analysis. It sets the framework for what will be studied.

2. Focussing (A)

After scoping, this step concentrates the analysis on the most significant potential impacts and relevant environmental aspects identified.

3. Impact Assessment (B)

Here, potential environmental impacts are identified and predicted. This involves determining the nature, magnitude, and timing of the effects.

4. Impact Mitigation (D)

Strategies are developed during this phase to avoid, reduce, or offset adverse environmental impacts identified in the assessment stage.

5. Impact Evaluation (C)

The final step involves assessing the significance of the predicted impacts, often considering the effectiveness of mitigation measures. This determines the overall consequence.

Correct Procedural Order

The correct sequence of the procedural steps in the ecological impact analysis process is:

  • Scoping (E)
  • Focussing (A)
  • Impact Assessment (B)
  • Impact Mitigation (D)
  • Impact Evaluation (C)

This order represents the logical progression from defining the study to evaluating the final environmental outcomes.

Was this answer helpful?

Important Questions from Environmental Impact Assessment

  1. Scoping step of EIA

    (i) Is a systematic exercise that establishes the boundaries of EIA

    (ii) Clearly indicates what is relevant and what is not relevant within EIA

    (iii) Serves as a work plan for the entire EIA process.

    Choose the correct answer from the code given below :

  2. What is a contingency plan in EIA? Select the best answer.

  3. Which EIA tool best identifies action-effect-impact relations?

  4. Assertion (A) : Leopold matrix can be expanded or contracted.
    Reason (R) : Leopold matrix is a checklist designed to show possible interactions between developmental activities and set of environmental characteristics.
    In the context of the two statements, which one of the following is correct ?
  5. In Battele environment evaluation system the total parameter importance units is lowest for
Need Expert Advice?

Start Your Preparation with Prepp Mobile App

Download the app from Google Play & App Store
Download the app from Google Play & App Store
Prepp Mobile App