All Exams Test series for 1 year @ ₹349 only
Question

Bottom shaft of a shuttle loom, weaving 2 up 1 down twill weave, is rotating at 90 rpm. The speed of cam shaft (in rpm) is _______

Loom Shaft Speed Calculation

This problem involves calculating the speed of the cam shaft on a shuttle loom based on the speed of the bottom shaft and the type of weave.

Understanding Shaft Speeds

In textile machinery, different shafts rotate at specific speeds related to the weaving process. The bottom shaft (often the main drive shaft) powers various loom mechanisms. The cam shaft specifically controls the shedding motion (lifting and lowering warp threads) based on the weave pattern.

Weave Pattern and Shaft Ratio

The weave pattern dictates the relationship between the speeds of different shafts. A '2 up 1 down' twill weave requires a specific sequence of shedding operations.

  • For a 2/1 twill weave, the ratio between the cam shaft speed and the bottom shaft speed is typically 2:3.

Calculating Cam Shaft Speed

The speed of the cam shaft can be determined using the following formula:

$Cam Shaft Speed = (Ratio Factor) * Bottom Shaft Speed$

In this case, the Ratio Factor is $\frac{2}{3}$.

  1. Given: Bottom shaft speed = 90 rpm.
  2. Apply the ratio: Cam Shaft Speed = $\frac{2}{3} \times 90 \text{ rpm}$
  3. Calculation: Cam Shaft Speed = $2 \times 30 \text{ rpm}$
  4. Result: Cam Shaft Speed = 60 rpm.

Therefore, the speed of the cam shaft is 60 rpm.

Was this answer helpful?

Important Questions from FABR Loom Mechanisms Shedding

  1. Group I lists the components of the weaving machine and Group II lists their functions. Match the component with its function.
    Group IGroup II
    P Conjugate/matched cams1Driving the cloth roller with slip
    drive
    Q Worm and worm wheel2Continuous positive take up
    motion
    R Friction clutch device3Motion of sley in rapier loom
    S Lease rod4Separation of the warp sheet
    forming the shed
  2. Amongst the following, the correct condition(s) that will reduce bumping during weaving is/are

  3. Group I lists weaving machine related parameters and Group II contains the shortcomings of these parameters. Match the machine related parameter with its shortcoming.
    Group IGroup II
    P. Variable heald staggering1. Not favourable for heavy fabric
    Q. High eccentricity ratio2. Reduction in shed height
    R. Fixed heald staggering3. Reduction of sley dwell
    S. Late shedding4. Higher vibration in weaving machine
  4. Group I gives a list of loom motions and Group II contains loom systems. Match the motion from Group I with the corresponding system from Group II.

    Group IGroup II
    P. Shedding1. Matched cam
    Q. Picking2. Seven wheel
    R. Beat-up3. Rapier
    S. Take-up4.Jacquard
  5. Determine the correctness or otherwise of the following Assertion [a] and Reason [r] 

    Assertion: In shuttle loom, late shedding is preferred for filament weaving. 

    Reason: In late shedding, the timing of shed dwell matches with the timing of shuttle travel through the shed, and therefore, it minimises the rubbing of warp yarns.

Need Expert Advice?

Start Your Preparation with Prepp Mobile App

Download the app from Google Play & App Store
Download the app from Google Play & App Store
Prepp Mobile App