All Exams Test series for 1 year @ ₹349 only
Question

Arrange the initial steps of construction of the swimming pool in proper sequence :

(a) Get a permit

(b) Excavate the area

(c) Design the pool

(d) Grade the ground

Choose the right option from the options given below :

The correct answer is

(c), (a), (b), (d)

Analyzing the Steps for Swimming Pool Construction

Building a swimming pool involves several steps, and it's crucial to follow them in the correct order to ensure the project is successful, legal, and safe. The question asks for the initial steps in the construction process and their proper sequence.

Breaking Down the Initial Swimming Pool Construction Steps

Let's look at the provided steps and think about their logical order:

  • (a) Get a permit: Legal permission is needed before starting significant construction work.
  • (b) Excavate the area: This is the physical process of digging the hole where the pool will be.
  • (c) Design the pool: This involves planning the size, shape, depth, features, and location of the pool.
  • (d) Grade the ground: This involves leveling and shaping the earth, typically after major digging, to prepare the base for the pool structure.

Determining the Correct Sequence for Building a Pool

Consider the flow of a construction project. Planning always comes first, and legal permissions are typically required before physical work begins. Physical work then proceeds from rough shaping to finer preparation.

  1. Design (c): You must first decide what you are building. The design process finalizes the plans, specifications, and layout of the swimming pool. This is the foundational step.
  2. Get a permit (a): Once the design is complete, you need to obtain the necessary building permits from local authorities. You cannot legally begin excavation or construction without this permission.
  3. Excavate the area (b): With the design approved and permits in hand, the next step is to physically dig the hole for the pool according to the design specifications. Excavation is the primary earth-moving step.
  4. Grade the ground (d): After the main excavation is done, the bottom and sides of the excavated area need to be fine-graded and prepared. This involves leveling the base and shaping the walls correctly before the pool structure (like rebar and concrete) is installed.

Therefore, the logical and standard sequence for these initial swimming pool construction steps is Design → Get a Permit → Excavate → Grade.

This sequence corresponds to (c), (a), (b), (d).

Initial Swimming Pool Construction Sequence
Order Step Action
1st (c) Design the pool Planning and finalizing pool specifications
2nd (a) Get a permit Obtaining legal permission to build
3rd (b) Excavate the area Digging the hole for the pool
4th (d) Grade the ground Leveling and shaping the base and walls after excavation

Conclusion on Swimming Pool Steps

Based on the standard process for building a swimming pool, the initial steps in the correct sequence are designing the pool, getting the necessary permits, excavating the area, and finally grading the ground before the pool structure is put in place.

Revision Table: Understanding Construction Sequencing

Key Considerations for Construction Sequencing
Step Type Why it Comes First/Later
Planning/Design Defines the project scope and details. Always comes before physical work or permissions.
Legal/Permitting Authorizes the work. Must be obtained before starting work that requires permission.
Major Earthwork (Excavation) The primary physical shaping of the site according to the design.
Fine Earthwork (Grading) Precision shaping and leveling after major earthwork to prepare for foundations/structures.

Additional Information: Beyond Initial Pool Construction Steps

After the initial steps of design, permitting, excavation, and grading, the swimming pool construction process continues with several other critical phases:

  • Plumbing and Electrical: Installing the pipes, drains, and electrical conduits for the pool's filtration, heating, and lighting systems.
  • Rebar and Framing: Installing the steel reinforcement cage that provides structural integrity to the pool shell.
  • Gunite or Shotcrete Application: Applying the concrete mixture (often called gunite or shotcrete) over the rebar frame to form the pool's shell.
  • Curing: Allowing the concrete shell to cure properly, which can take several days to weeks.
  • Tile and Coping: Installing the waterline tile and coping (the cap around the edge of the pool).
  • Decking: Pouring or laying the deck area around the pool.
  • Interior Finish: Applying the final interior surface of the pool (like plaster, aggregate, or tile).
  • Filling and Start-up: Filling the pool with water and starting the filtration system and balancing water chemistry.
  • Landscaping and Fencing: Finishing the surrounding area and installing required safety fencing.

Each of these subsequent steps also follows a specific order to ensure a durable and functional swimming pool.

Was this answer helpful?

Important Questions from Sports Event

  1. Chief Judges of the Ancient Olympic Games were also known as

  2. Select the correct sequence of chronology of undermentioned Olympic Games :

  3. Assertion (A) : Every international and national sports organisation should have an officer responsible for contacts and personal relations with the media.

    Reason (R) : Contacts like name, telephone number of media officer should not be disclosed before the media for confidential reasons.

    Select the correct option :

  4. Arrange the press release information in proper sequence from earlier to later stage in relation to coverage of sports event :

    (a) Detail of competition, history of the event

    (b) Date, place, invited teams

    (c) Complete information of the competitors' names and confirmed teams

    (d) Arrival of teams/athletes on the site at different timing

    Select the correct sequence from the following :

  5. "Target Olympic Podium Scheme" of Ministry of Sports of India was started in which of the following year?

Need Expert Advice?

Start Your Preparation with Prepp Mobile App

Download the app from Google Play & App Store
Download the app from Google Play & App Store
Prepp Mobile App