Arrange the initial steps of construction of the swimming pool in proper sequence : (a) Get a permit (b) Excavate the area (c) Design the pool (d) Grade the ground Choose the right option from the options given below :
(c), (a), (b), (d)
Building a swimming pool involves several steps, and it's crucial to follow them in the correct order to ensure the project is successful, legal, and safe. The question asks for the initial steps in the construction process and their proper sequence.
Let's look at the provided steps and think about their logical order:
Consider the flow of a construction project. Planning always comes first, and legal permissions are typically required before physical work begins. Physical work then proceeds from rough shaping to finer preparation.
Therefore, the logical and standard sequence for these initial swimming pool construction steps is Design → Get a Permit → Excavate → Grade.
This sequence corresponds to (c), (a), (b), (d).
| Order | Step | Action |
|---|---|---|
| 1st | (c) Design the pool | Planning and finalizing pool specifications |
| 2nd | (a) Get a permit | Obtaining legal permission to build |
| 3rd | (b) Excavate the area | Digging the hole for the pool |
| 4th | (d) Grade the ground | Leveling and shaping the base and walls after excavation |
Based on the standard process for building a swimming pool, the initial steps in the correct sequence are designing the pool, getting the necessary permits, excavating the area, and finally grading the ground before the pool structure is put in place.
| Step Type | Why it Comes First/Later |
|---|---|
| Planning/Design | Defines the project scope and details. Always comes before physical work or permissions. |
| Legal/Permitting | Authorizes the work. Must be obtained before starting work that requires permission. |
| Major Earthwork (Excavation) | The primary physical shaping of the site according to the design. |
| Fine Earthwork (Grading) | Precision shaping and leveling after major earthwork to prepare for foundations/structures. |
After the initial steps of design, permitting, excavation, and grading, the swimming pool construction process continues with several other critical phases:
Each of these subsequent steps also follows a specific order to ensure a durable and functional swimming pool.
Chief Judges of the Ancient Olympic Games were also known as
Select the correct sequence of chronology of undermentioned Olympic Games :
Assertion (A) : Every international and national sports organisation should have an officer responsible for contacts and personal relations with the media.
Reason (R) : Contacts like name, telephone number of media officer should not be disclosed before the media for confidential reasons.
Select the correct option :
Arrange the press release information in proper sequence from earlier to later stage in relation to coverage of sports event :
(a) Detail of competition, history of the event
(b) Date, place, invited teams
(c) Complete information of the competitors' names and confirmed teams
(d) Arrival of teams/athletes on the site at different timing
Select the correct sequence from the following :
"Target Olympic Podium Scheme" of Ministry of Sports of India was started in which of the following year?