A. Draw a to-the-scale floor plan of work area and fix it on board
B. Take measured thread and ask worker to begin the task
C. Fix pins on plan wherever the worker changes path
D. On completion measure the leftover thread and deduct this length from the total thread length to know time and distance travelled by the worker
E. Keep on tying the thread on the pins wherever the worker goes and note the time also
Choose the correct answer from the options given below:
Pathway analysis involves observing and measuring worker movement to improve efficiency. The steps must be performed in a logical order:
This is the initial step, creating a visual map of the workspace.
Mark critical points or changes in direction on the floor plan.
Start the actual observation or task execution, having the measuring tool (thread) ready.
Measure the path distance covered by the worker on the plan using the thread.
Final step to analyze the collected data, determining the time and distance travelled.
Therefore, the correct sequence is A, C, B, E, D.
Arrange the operations in production planning and control in correct sequence :
(i) Routing
(ii) Dispatching
(iii) Follow up
(iv) Scheduling
Choose the correct answer from the code given below:
The following statements relate to decision tree analysis. Choose the correct code for the statements being correct or incorrect.
Statement I: A decision tree contains the probabilities of outcomes and the conditional monetary values attached to those outcomes.
Statement II : In a decision tree, 'nodes' at the left represent actions that occur before nodes that fall farther to the right.
As per the colour code a red colour indicates
Analysis is an operation, when carried out in terms of individual motions of a worker is known as