A narrow track, prepared along the alignment of hill road for inspection during location of the road, is known as ______.

The correct answer is

trace cut

When planning and constructing a road, especially in challenging terrain like hills, engineers need to establish the precise path the road will follow. This process is called location or alignment.

During the location survey of a hill road, a preliminary, narrow track is often prepared directly on the ground along the proposed path. This track serves a crucial purpose:

  • It allows engineers and surveyors to walk along the planned alignment.
  • It helps in inspecting the ground conditions, slopes, and potential obstacles firsthand.
  • It helps in finalizing the road's exact position before major earthwork begins.

This narrow, temporary path prepared for inspection during the location of a hill road is specifically known as a trace cut.

Understanding Trace Cut in Hill Road Construction

A trace cut is essentially a small excavation or track marked out on the hillside. It follows the planned center line of the future road. Its primary function is reconnaissance and detailed inspection of the alignment marked on maps during the initial survey stages. Walking the trace cut allows the team to assess the feasibility, gradient, drainage requirements, and potential stability issues of the proposed route.

Evaluating Other Options

Let's look at why the other options are not correct in this context:

  • Camber: This refers to the cross slope provided on the road surface to drain water away from the center. It is a feature of the finished road, not a preliminary track for location inspection.
  • Resisting length: This term is typically associated with railway engineering, related to curves and track resistance, not the initial location phase of a hill road.
  • Sight distance: This is the length of road visible ahead to a driver, crucial for safety. It is a design parameter of the finished road alignment, not a physical track prepared for inspection during location.

Therefore, based on its definition and purpose in the context of hill road location, the correct term for the narrow track used for inspection is trace cut.

Was this answer helpful?

Important Questions from Highway Geometric Design

  1. The rate of super-elevation for a horizontal curve of radius $500 \text{ m}$ in a national highway for a design speed of $65 \text{ kmph}$ is:

  2. Consider the following statements about grade compensation:

    (i) Grade compensation is given up to the maximum value of '75/R', where R is the radius of circular curve in metres.

    (ii) According to Indian Roads Congress, grade compensation is not necessary for gradients flatter than 4 percent.

    Which of the above statement/s is/are correct?

  3. The type of transition curve that is generally provided on hill road is

  4. The minimum design speed adopted where hair-pin bends are provided at hill roads is _________.

  5. The rear wheels do not follow the same path as that of the front wheels. This phenomenon is called: