A and B can complete a piece of work in 15 days and 10 days respectively. They got a contract to complete the work for Rs. 35000. The share of A (in Rs.) in the contracted money will be:
14000
This problem involves the concept of work, time, and how wages are distributed based on the amount of work done or the efficiency of the workers. When two or more people work together, the total wage received for completing the work is generally shared among them in the ratio of the work done by each person. If they work for the same amount of time, the work done is proportional to their individual work rates or efficiencies. If they complete the entire work independently in different amounts of time, their efficiencies are inversely proportional to the time taken.
The work rate is the amount of work a person can do in one unit of time (in this case, one day). The work rate is the reciprocal of the time taken to complete the entire work.
Since A and B are working together to complete the entire work, and assuming they work until the work is finished, the total work done by A and B combined completes 1 unit of work. The share of the contracted money should be distributed in the ratio of the work done by A and B. If they work together for the same duration to complete the work, the ratio of work done is the same as the ratio of their individual work rates.
Ratio of A's work rate to B's work rate = \( \text{A's rate} : \text{B's rate} \)
Ratio = \( \frac{1}{15} : \frac{1}{10} \)
To get rid of the fractions, we can multiply both parts of the ratio by the least common multiple (LCM) of the denominators (15 and 10). The LCM of 15 and 10 is 30.
Ratio = \( 30 \times \frac{1}{15} : 30 \times \frac{1}{10} \)
Ratio = \( 2 : 3 \)
This means that for every 2 units of work done by A, B does 3 units of work. Therefore, the total work done is divided in the ratio 2:3 between A and B. The contracted money of Rs. 35000 will be divided in this ratio.
The total ratio parts are \( 2 + 3 = 5 \).
A's share is \( \frac{\text{A's ratio part}}{\text{Total ratio parts}} \) of the total contracted money.
A's share = \( \frac{2}{5} \times 35000 \)
A's share = \( 2 \times \left(\frac{35000}{5}\right) \)
A's share = \( 2 \times 7000 \)
A's share = \( 14000 \)
So, the share of A in the contracted money is Rs. 14000.
| Worker | Time Taken (days) | Work Rate (per day) | Ratio of Rates | Share Ratio |
|---|---|---|---|---|
| A | 15 | \( \frac{1}{15} \) | \( \frac{1}{15} \) | 2 |
| B | 10 | \( \frac{1}{10} \) | \( \frac{1}{10} \) | 3 |
| Total | - | - | \( \frac{1}{15} : \frac{1}{10} = 2:3 \) | \( 2+3=5 \) |
Total contract amount = Rs. 35000
A's share = \( \frac{2}{5} \times 35000 = 14000 \)
B's share = \( \frac{3}{5} \times 35000 = 21000 \)
Check: \( 14000 + 21000 = 35000 \). This matches the total contract amount.
The share of A in the contracted money is Rs. 14000.
| Concept | Explanation | Formula/Relation |
|---|---|---|
| Work Rate | Amount of work done per unit of time. | Work Rate = \( \frac{\text{Total Work}}{\text{Time Taken}} \) |
| Time and Rate Relation | Time taken is inversely proportional to the work rate (if work is constant). | Time \(\propto \frac{1}{\text{Rate}}\) |
| Wage Distribution | Wages are distributed in the ratio of the work done by each person. If they work for the same duration, wages are distributed in the ratio of their work rates/efficiencies. | Wage \(\propto\) Work Done Wage \(\propto\) Rate (if time is constant) |
Which among the following are true about wages?
A. The fair wage was something between minimum wage and living wage
B. The Surplus Value Theory is associated with Maurice Dobb
C. As per the Wages Fund Theory there exists pre-determined fund for the payment of wages
D. Living wage provides workers and their families to live on some level considered adequate
E. According to the "Bargaining Theory" there is an upper and lower limit on wage rates and the actual rates are determined by the capitalist
Choose the most appropriate answer from the options given below:
X and Y undertook to do a piece of work for Rs 5400. X alone could do this work in 18 days and Y alone could do this work in 24 days. With the assistance of Z they finished the work in 8 days. What is the share (in Rs) of Z?